How Long Does a Carpentry Renovation Take in Singapore?

15 Aug 2026

One of the most common questions we receive at our Jalan Kayu showroom is: how long will this take? The answer depends on what you are doing, but here are realistic timelines based on thousands of HOBI projects.

From Signing to Installation

Once you confirm your project and pay the deposit, the timeline breaks down roughly as follows:

Design finalisation: 3 to 7 days. We will refine the design drawings based on your feedback and get your sign-off before production begins.

Material ordering: 3 to 5 days. Boards, hardware, countertop materials, and finishes are ordered from our suppliers.

Factory production: 10 to 21 days depending on project complexity. Your furniture is built in our Bedok factory.

Delivery and installation: 1 to 5 days on-site depending on scope.

Realistic Timelines by Project Type

Single kitchen: 3 to 4 weeks from deposit to installation complete.

Single wardrobe: 2 to 3 weeks.

Kitchen + wardrobe package: 4 to 5 weeks.

Full home renovation (carpentry): 6 to 10 weeks.

What Can Delay a Project

The most common delays are: late design sign-off by the homeowner, unavailability of the flat for installation, and festive period slowdowns (Chinese New Year, Hari Raya). Plan around these.

Track Your Project Online

Every HOBI project comes with access to our customer portal where you can see your project status in real time — from factory production through to installation scheduling. You are never left wondering.

Need help with your renovation?

Get a free consultation with our designers.

Get Free Consultation →
💰 Free Quote
Wait — Before You Go
Get Our Free
Pricing Guide
Download our 2026 Singapore carpentry price list — no obligation, no sales calls.
📋
What you'll get instantly: Kitchen cabinet prices · Wardrobe costs · TV console ranges · Full reno estimates — all by flat type.
No thanks, I'll figure it out myself