BTO Renovation Guide 2026
Everything first-time BTO homeowners need to know — timeline, costs, and how to get the best result.
The BTO opportunity is massive
HDB launched 19,600 BTO flats in 2026 across 3 exercises. Another 55,000 planned for 2025–2027. Every single one needs carpentry.
BTO Renovation Timeline
What happens and when — from key collection to move-in.
Visit HOBI showroom, get 3D design, sign contract. Best contractors book up fast — start here before your key collection date.
Collect keys, inspect for defects, submit HDB renovation permit (HOBI handles this for you within days).
Tiling, plumbing changes if any. HOBI coordinates with trusted trades if needed.
Built in our Bedok factory while wet works dry. You approve the 3D design before fabrication starts.
HOBI team installs all carpentry. Typically 3–5 days for a full flat.
Final walkthrough. Any issues fixed on the spot. HOBI Care+ warranty starts from this date.
Collecting your BTO keys soon?
Visit us 3–6 months before key collection. Get your 3D design done and contractor locked in before the rush.